Hangar A340 Refurbishment
The Refurbishment of Hangar 340 internal fit-outs, re-sheeting the existing roofing, infrastructure upgrades, and replacement/rectification of heavy-duty pavement to support military vehicles & tanks. OPT Concrete's scope of works included all labour, plant, equipment, and materials required for the demolition, removal, and reinstatement of approximately 2,400m2 of 250mm thick dual layered reinforcement, plus the rectification of approximately 2,000m2 of heavy-duty pavement in terms of joint spalling & cracking.
Armoury Vault Works
The construction of a new in-situ heavy-duty vault capable of withstanding internal & external explosions for the storage of munitions.
Armoured Fighting Vehicles Facilities Program
The FRP construction of the new Simulation (A1972) Building’s Ground and Lower Ground Slab.